A Kit of Parts
Project Frog’s new metal building is a 4,000-sq.-ft. structure with four classrooms. Two of the four classrooms can be converted into a single, larger space. Architects can freely design both the interior and exterior façade as desired, contributing to the design flexibility of the solution. DSA pre-check approval is expected in the coming months.This new building is part of the company’s componentized Kit-of-Parts system enabling the design and deployment of buildings in short time frames, ideal for the limited build windows associated with schools.Project Frog’s light gauge steel wall panels are flexible and forgiving to work with, making them easy to assemble while still
More