Timing Was Everything

July 31, 2018

With at least 20 different elevation levels, the 146,000-sq.-ft. roof of the new West Springfield High School in West Springfield, Mass., posed some serious timing challenges for both installers and construction managers. Interior contractors couldn’t do finish work until the roof in those areas was watertight, so roofing schedules had to be closely coordinated with other trades. Using DensDeck Roof Board, topped by VapAir Seal 725TR self-adhered air and vapor barrier membrane, provided the necessary waterproofing and allowed interior work to progress while remaining roofing components, including the finishing layer of Sure-Flex PVC membrane, to be installed at their own pace.

Sponsored Recommendations

Eldorado Stone Before & Afters

Check out some of Eldorado's recent projects. This will show you the before and after results of how Eldorado could add value to your next architectural endeavor.

Eldorado Stone Inspiration Galleries

For over 50 years, Eldorado Stone has demonstrated an undeniable passion for creating authentic products that elevate not only quality and design but also attainability.

About Eldorado Stone

Today, Eldorado is recognized as a leader in quality and innovation in the U.S. and around the world. Eldorado Stone, LLC is headquartered in Oceanside, CA, and currently operates...

Stone 101 Guide

Renovating or building your home can be both exciting and daunting as you go through the process of choosing an optimal layout, the best materials, and pleasing colors and finishes...